75PE oneAdvanced commercial
Project | Housing development, Co.Cork. |
Products | 75PE oneAdvanced commercial |
Application | Wastewater treatment |
Population equivalent | 75PE |
New on-site wastewater treatment system for a housing development in Co.Cork
This project involved the design and implementation of a new on-site wastewater treatment system for a housing development comprising 13 houses in Co. Cork. The new system was required to replace an existing one that failed to meet the required effluent discharge standards.
The new wastewater treatment solution was engineered to meet stricter effluent quality requirements, with discharge standards of 20mg/L BOD, 30mg/L SS, and 20mg/L ammonia.
The upgraded system includes:
- An external cabinet housing the treatment controls.
- WebMonitor telemetry for real-time monitoring and system management.
- A pump station to ensure efficient wastewater handling.
- Connection to the existing percolation area, reducing the need for additional infrastructure.
This comprehensive solution ensures that treated effluent complies with all local regulatory standards, providing a reliable and sustainable wastewater treatment system for the development.