Factory Building Sandrigo

Products 515 EcoBloc Inspect flex
Application Infiltration
Storage capacity 110 m³
Collecting surface area 1000 m²
Specifics 16.8 m x 4 m x 1.6 m
5 Layers
3 installers, installed in 2 days
Infiltration in a very permeable gravel soil


New factory building in Sandrigo, Italy

Infiltration for rainwater from the roof of a new factory building (approx. 1000 mq roof surface). The EcoBloc Flex are installed in front of the new building where trucks are up and unloaded. Request for SLW 60. Two Vario 800 shafts for inspection are installed on the angles.